MyCollectory (beta) We are working hard on MyCollectory, feel free to register!
Recent searches
Critical Path

Critical Path

Movie 2026 · 34m ·

The engineering journey to Starship and beyond.

Your check-in

Critical Path

Sign in Create account Sign in to log this title.
Share

Critical Path offers an exclusive, behind-the-scenes look at the engineering marvel that is the SpaceX Starship program. The documentary details the iterative design philosophy, the high-stakes testing, and the relentless drive to build the largest and most powerful rocket ever flown. From the first conceptual sketches to the atmospheric re-entry and landing attempts, this film chronicles the single, complex path of innovation required to make life multi-planetary.

Cast

10 people

More like this